
A £7m campus-wide transformation adding capacity for 300 more pupils while improving accessibility, SEND provision, circulation and transport — and achieving BREEAM Excellent, all within a live school.
Fulford School Expansion
Client:
South York Multi Academy Trust
Location:
York
Client:
Education
Client:
Architecture, Inclusive Design, Cost Management, Project Management
Project Overview
E3 Cube was appointed to develop and deliver a comprehensive expansion strategy for Fulford School, supporting an increase in capacity from 1,603 to 1,903 pupils and raising the Year 7 intake from 240 to 300 students. The project was required to be delivered within a fully operational secondary school campus while addressing longstanding estate, accessibility, circulation and transport challenges.
The scheme extended beyond the provision of additional teaching accommodation and became a transformational campus-wide redevelopment programme, combining new build, refurbishment, accessibility improvements, infrastructure upgrades and operational enhancements to create a more efficient and sustainable learning environment.
Understanding the Challenge
The school campus had evolved over several decades through a series of uncoordinated building additions, resulting in inefficient layouts, overcrowding, poor wayfinding and reliance on ageing temporary accommodation.
Through detailed estate reviews, accommodation audits, curriculum analysis and stakeholder consultation, E3 Cube identified several key challenges:
Insufficient teaching accommodation to support planned growth.
Overcrowded circulation routes and social spaces.
Equality Act compliance issues within existing buildings.
Temporary buildings reaching the end of their useful life.
Significant traffic congestion caused by coach and parent drop-off activity.
Insufficient WC and student welfare provision.
The need to protect valuable sports and green space.
Longstanding concerns from neighbouring residents relating to access and traffic management.
A planning requirement to achieve BREEAM Excellent accreditation.
Stakeholder Engagement and Brief Development
A comprehensive consultation process underpinned the development of the project brief.
E3 Cube worked closely with:
South York Multi Academy Trust
School leadership and teaching staff
City of York Council
SEND stakeholders
Local residents & Town Council
Planning and highways officers
Using accommodation modelling, curriculum analysis and campus masterplanning, we developed a detailed understanding of how the estate functioned and identified opportunities to improve both capacity and operational efficiency.
A series of option appraisal workshops enabled stakeholders to evaluate alternative solutions against educational benefits, cost, programme, phasing and operational impacts. This collaborative approach ensured the preferred solution reflected both strategic growth requirements and the school's long-term vision.
Design Solution
The agreed masterplan delivered a balanced combination of new build, refurbishment and infrastructure improvements, including:
A new two-storey teaching block replacing obsolete temporary accommodation.
Refurbishment and remodelling of three existing buildings.
New lift installation to improve accessibility and Equality Act compliance.
Refurbishment and enhancement of the school's SEND Resourced Provision.
Temporary classroom accommodation to facilitate phased construction.
Rationalisation and demolition of redundant buildings.
Departmental relocations to improve operational efficiency.
A new rear campus access road enabling a one-way coach circulation system and reducing congestion within neighbouring residential areas.
The design also addressed longstanding circulation issues by redistributing departments and reducing pressure on heavily congested areas of the campus, improving both student movement and safeguarding.
Sustainability and BREEAM Excellence
Achieving BREEAM Excellent was a mandatory planning requirement and a critical project objective.
E3 Cube embedded a specialist BREEAM Assessor within the design team from project inception, ensuring sustainability requirements informed every stage of design development.
Early integration enabled the team to secure key credits efficiently, avoiding costly redesign and ensuring compliance with planning obligations.
The completed scheme successfully achieved BREEAM Excellent accreditation, supporting the Trust's environmental objectives while delivering a future-proofed educational facility.
Procurement and Delivery
The project was procured through a compliant two-stage competitive tender process, providing value for money while maintaining programme certainty.
Given the complexities of constructing within a live secondary school environment, E3 Cube developed a detailed logistics and phasing strategy. Construction activities were carefully planned around school operations, with robust health and safety controls, segregated access routes and dedicated traffic management measures implemented throughout the works.
The result was the safe delivery of a complex programme of new build, refurbishment and infrastructure works while maintaining uninterrupted educational operations.
Outcome
The project successfully transformed Fulford School's campus, creating additional capacity for 300 more pupils while delivering significant improvements to accessibility, circulation, student wellbeing, transport management and operational efficiency.
Completion
The scheme provides a coherent long-term masterplan for the estate, replacing ageing accommodation with modern learning environments, enhancing SEND provision, resolving historic campus challenges and achieving BREEAM Excellent accreditation. Delivered within a live school environment, the project demonstrates E3 Cube's ability to manage complex stakeholder requirements and deliver major educational developments with minimal disruption to teaching and learning




